Waterworks Clauses Act, 1847

Map and plan of underground works to be made, and corrected from time to time.

19. The undertakers shall from time to time, within six months from the time at which any pipes, conduits, or underground works shall have been laid down or formed by them, cause a survey and map to be made of the district within which any such pipes or underground works shall be laid, on a scale not less than one foot to a mile, and shall cause to be marked thereon the course and situation of all existing pipes or conduits for the collection, passage, or distribution of water and underground works belonging to them, in order to show all such underground works within the said district, and shall, within six months from the making of any alterations or additions, cause the said map to be from time to time corrected, and such additions made thereto as may show the line and situation of all such pipes, conduits, and underground works as may be laid down or formed by them from time to time after the passing of the special Act; and such map and plan, or a copy thereof, with the date expressed thereon of the last time when the same shall have been so corrected as aforesaid, shall be kept in the office of the undertakers, and shall be open to the inspection of all persons interested in the same within the said district.